Project Overview

Rapid turnaround industrial latex screeding for a 24/7 logistics hub in Birmingham's Digbeth district. 800m² leveled and traffic-ready in 6 hours.

Expertise You Can Trust

With over 15 years of industry experience, UK Commercial Flooring delivers precision-engineered solutions.

The Challenge

A busy logistics warehouse in Bordesley Green/Digbeth faced operational hazards due to a 20mm variance in the concrete slab. Forklifts were destabilizing, and the uneven surface prevented the installation of a new Underfloor Heating (UFH) system. The client, Anon Logistics, required a Day 1 strength of 10N/mm² to resume operations immediately.

  • Significant 20mm voids across 800m² floor plate
  • Urgent need for 10N/mm² compressive strength within 24h
  • Installation over new Underfloor Heating (UFH) pipes
  • Strict 6-hour curing window for foot traffic

Expertise-Driven Solution

We specified UltraTech Latex Fibre, a high-performance fibre-reinforced compound. The process involved diamond grinding the substrate for adhesion, priming, and pump-applying the latex at 8-12mm thickness to encapsulate the UFH system and level the floor simultaneously.

1

Step 1

Diamond grinding of substrate with dust extraction to ensure key.

2

Step 2

Application of epoxy primer to seal the slab and prevent air bubbles.

3

Step 3

Flow-application of UltraTech Latex Fibre at 8-12mm thickness.

4

Step 4

Power-float finishing to achieve a glass-smooth surface for liquid screed overlay.

The Results

The project delivered a perfectly level SR1 surface, enhancing the floor's load-bearing capacity to 500kg/m². The client saved £5,000 compared to full slab replacement and resumed full operations within 24 hours.

MetricBeforeAfterImprovement
Level Tolerance+/- 20mm+/- 2mm (SR1)Precision Levelled
Curing Time7 Days (Concrete)6 Hours (Latex)96% Faster
Load CapacityCompromised500kg/m²Heavy Duty
Cost EfficiencyFull ReplacementOverlay£5k Saved

Project Success

Delivered on time, within budget, and exceeding quality expectations.

Have a similar project?

Get a free, no-obligation consultation and quote for your latex needs.

Get Free Quote

"Birmingham warehouse levelled overnight – pros! The team arrived at 6 PM and we were walking on it by midnight. Incredible turnaround."

Site Director, Anon Logistics
Latex Project

Project Key Facts

  • LocationBirmingham (Digbeth)
  • ServiceLatex
  • Completed2026-02-10